What is Technical Interface Office?

Diyar has established the Technical Interface Office (TIO) to safeguard Diyar’s planning principles by guiding Third party developers (TPDs) and / landowners and their Consultants through the design approvals process; support the TPD Consultant in obtaining Government Authority approvals; and monitoring the safe and compliant of construction and buildings on site; all through prescribed in the DRG’s. The TIO is committed to supporting its valued partners through its professional team and user-friendly processes. TIO Services can be summarized as:

Management of Diyar’s, Development Regulations and Guidelines (DRG), and Environmental & Construction regulations.
-  Review TPD’s design proposals to ensure compliance of design drawings to Diyar’s DRG’s.
-  Issuance of No Objection Certificates (NOC) and Completion Certificates for TPD consultants to obtain the relevant concerned Government approvals.
-  Facilitate communication & assist TPD consultants with relevant Government Authorities in order to obtain final approvals.
-  Provide Technical assistance to TPDs and their Consultants.
-  Monitor construction activities to ensure Compliance to approved design drawings, encourage safe working practices and minimize the impact of construction on surrounding properties and environment.

Villa Modifications Requests

TIO is committed to supporting its valued partners through its professional team and user-friendly processes
Please click on the button below, to submit your Villa Modifications Request.

General Frequently Asked Questions (FAQ)

Each villa is allowed a certain number of additions as per the specified location and size shown in the Building Regulation booklet related to your villa type received in the handover.

Refer to the booklet related to your villa in the link below.

Please download TIO Building Permit Procedure in the link below for steps to obtain your Building Permit and the required documents to be submitted.

Please download Diyar Al Muharraq Guidelines in the link below for the full list of permitted/non permitted works.

To ensure that the required work does not conflict with the building regulations within Diyar Al Muharraq nor jeopardizing the health and safety of the villa’s residents and the environment.

Villa Owners should submit their request through TIO online portal https://bit.ly/31CrGT0

specifying the type of work to be done. Please download CW Permission Procedure in the link below for steps to obtain your work permission.

It requires maximum 3 working days to be processed by TIO once all required information / documents are submitted, if the application is rejected, villa owner should submit the request again through TIO online portal after addressing the mentioned comments.

No, as this area has to be open to allow air flow circulation where gases and fumes are induced, and to provide an emergency exit when needed.

Yes, provided that the regulations mentioned in Diyar Al Muharraq Guideline are followed. Note that a commencing work permission has to be obtained from TIO office prior starting any works in the villa.

Resources

Please download TIO Building Permit Procedure in the link below for steps to obtain your Building Permit and the required documents to be submitted.

For Concept Design review it takes 3-5 working days based on size of project. For Detailed Design review it takes 7-10 working days based on size of project.

Yes, please refer to table number 1.4.3 in Booklet 1 in the link below for the specific fees based on your plot area.

Survey Certificate of the plot can be issued from Muharraq Municipality (Building permit section). Please contact 17984083 for more details.

Yes, there is. Please download Diyar’s Building Regulation (booklet-2) in the link below for more information.